Set up(Set up procedure chart attached)
1.Choose place. According size of the tent, clean the stone and other sundries on the ground.
2.Open the tent package, take out and unfold the ground sheet.Put tent on the center of ground sheet. Outer layer is upwards. The long sides of the tent parallel to the long side of the ground sheet, remove the strapping.
3.One person stand in the each side of the width direction, two persons stand in each side of the length side. Lift the tent from the ground and extend the maximum extension of the tent .
4.In the above operation, the operation should coordinate the movements, check the ground without obstacles at every two or three steps, and ensure rope whether pull other hub plates and all hub pates are aligned in a straight line.
5.Every person takes one strut stand in the position of the door. Find in the hub plate with red arrow sign in the door of the inner tent layer. When hear the order, every person lift tent and make strut quickly support in the hub plate with logo.Under a unified command, the four people at the entrance alternately moved the erection poles inward to the second marked hub and supported the tent.
6.Check tent body whether wrap tent frame, whether the velcro is attached to the ground sheet and other obstacles that block tent set up.
7.Worker back to the position of the strut, when hear the order, coordinated lift strut to open the tent (don’t seize the frame pole to lift tent around the tent ), until the wall is vertical and tents are fully opened.
8.Adjust the tent to align it with the ground sheet. If the movement distance is small, lift the tent in the door to move to the appropriate position. If there is a long distance movement, it is necessary to use the strut hold up the hub plate with the logo and lift the tent to the appropriate position.
9.Ground sheet, lift up the tent and place the inner ground sheet in the tent. Put the hook in the ground sheet edge on the rope ring of correspond retaining bolt on the tent frame, connect the Velcro at the ground sheet edge with the Velcro at the bottom of the tent side wall.
10.Put the outer tent dress fabric on outside of the tent. Dress fabric with metal ring, ground sheet metal ring and steel wire for fixing bolt fix by pins. Fix ground sheet and tent frame, make the tent frame and ground sheet positioning. Put the soil on dress and dig the drainage ditch around the tent.
11.Install the pegs on the ground, tensioning the rope.
12.Install PVC windows, close the unused door. Clean the site, put the unused accessories and package bags back to package cage, avoid loss.