ORDER ONLINE OR CALL US :+86-022-60772269/8023
COMPREHENSIVE SERVICE
Home / Comprehensive Service
After-sale Service
12 Months Warranty After Shipment
Strict Quality Control And Inspection Before Shipment
Perfect After-Sales Service System
Operating Manual
Operating Manual of Grid Folding Tent

Set up(Set up procedure chart attached)

1.Choose place. According size of the tent, clean the stone and other sundries on the ground.
2.Open the tent package, take out and unfold the ground sheet.Put tent on the center of ground sheet. Outer layer is upwards. The long sides of the tent parallel to the long side of the ground sheet, remove the strapping.
3.One person stand in the each side of the width direction, two persons stand in each side of the length side. Lift the tent from the ground and extend the maximum extension of the tent .
4.In the above operation, the operation should coordinate the movements, check the ground without obstacles at every two or three steps, and ensure rope whether pull other hub plates and all hub pates are aligned in a straight line.
5.Every person takes one strut stand in the position of the door. Find in the hub plate with red arrow sign in the door of the inner tent layer. When hear the order, every person lift tent and make strut quickly support in the hub plate with logo.Under a unified command, the four people at the entrance alternately moved the erection poles inward to the second marked hub and supported the tent.
6.Check tent body whether wrap tent frame, whether the velcro is attached to the ground sheet and other obstacles that block tent set up.
7.Worker back to the position of the strut, when hear the order, coordinated lift strut to open the tent (don’t seize the frame pole to lift tent around the tent ), until the wall is vertical and tents are fully opened.
8.Adjust the tent to align it with the ground sheet. If the movement distance is small, lift the tent in the door to move to the appropriate position. If there is a long distance movement, it is necessary to use the strut hold up the hub plate with the logo and lift the tent to the appropriate position.
9.Ground sheet, lift up the tent and place the inner ground sheet in the tent. Put the hook in the ground sheet edge on the rope ring of correspond retaining bolt on the tent frame, connect the Velcro at the ground sheet edge with the Velcro at the bottom of the tent side wall.
10.Put the outer tent dress fabric on outside of the tent. Dress fabric with metal ring, ground sheet metal ring and steel wire for fixing bolt fix by pins. Fix ground sheet and tent frame, make the tent frame and ground sheet positioning. Put the soil on dress and dig the drainage ditch around the tent.
11.Install the pegs on the ground, tensioning the rope.
12.Install PVC windows, close the unused door. Clean the site, put the unused accessories and package bags back to package cage, avoid loss.

Take down(Set up procedure chart attached)

1.Take away guy ropes on the pegs, clean soil, pull out all pins.
2.Remove the edge of the ground sheet from inter tent fabric. Fold it flat on the ground sheet. Take out all hooks, remove PVC windows, close all the curtains.
3.Starting from the long side of the tent, two persons as a group pull the side walls slightly. Check and clean the obstacles that hinder the tent take down.
4.Each short side stand one person, long side stand two persons, every person catch hold of outside bottom hub plate. When hear order then to pull, make the tent take down.
5.When hear order, grab the hub pale and lift the tent move to the middle and then close tent. Make up tent fabric and guy ropes, make the hub plate out.
6.Flip the tent and make up the tent fabric, make the hub plate out. Strap tent under the hub plate 40cm.one person strap, others squeeze the tent to strap tight.Flip tent, bundle tight in the same way at the other end.
7.Lift the tent from the ground sheet and fold it to length 1.4m. Put tent down on the ground sheet ,roll the tent up the ground sheet, make the ground sheet to tighten the tent.
8.Erect the tent, inner tent upwards, one person grip the ground sheet, others packaging the package bag. Flip the package bag, put into the installation rods, tie the package bag tightly and tie the straps.(note:operating manual in the long side ).
9.Put the pegs package bag, PVC windows and other accessories into the accessories bag.
10.Tent package bags and accessories bags put into the package cage.

Note

1.Keep cleaning during using tent.
2.Check guy ropes and pegs after rain, snow or strong wind,clean water cover and snow cover.
3.Set up and take down procedure should be coordinated, don’t catch frame to lift and move the tent, clear any obstructions that prevent the tent set up.
4.Tent wire ring can’t load heavy goods.
5.During set up and take down, if there are some poles break, should be repaired in time, if the break at the middle between connecting pins and end pole, can use the tools in repair kit and accessories bags to repair.

Transportation and storage

1.During transportation, set up and take down, if there is no package cage,the tent should lift move,don’t drag on the ground.
2.Tent frame is thin-wall aluminum alloy tube. Can’t long term transportation and storage without package cage. If package cage damaged during use,Upload and unload should be careful, Keep the tent parallel to the ground (Unload refer to below figure).
Our products sell well in more than 50 countries and regions at home and abroad.
 

QUICK LINKS

CATEGORIES

GET IN TOUCH WITH US
Copyright © 2023 Qinhuangdao City Aosener Equipment And Garment Limited Company  | Sitemap | Privacy Policy | Support By Leadong.